Module and inverter selection, yield with a full loss waterfall, cost build-ups, financing, and revenue under real market scenarios — from array layout to levelised cost, priced against the live CEGridSight market rather than a flat assumption.
Module, inverter and tracker configuration through soiling, thermal, mismatch, clipping and availability losses to net AEP with P50/P75/P90 distributions.
Bottom-up capex and opex by component and balance-of-plant, debt sizing, DSCR covenants, tax structures — transparent throughout.
PPA, hub, basis and curtailment paths give LCOE, IRR, NPV and payback side by side, with attribution per driver.
Early-access partners shape the model and lock founding terms.